COZBY ENTERPRISES, INC.
P. O. Box 1104
Anaconda
,
MT
59711
ph:
(406) 563-5186
alt:
(406) 560-0118
fbcanaco
nda
@msn
.com
Home
Site Map
1 ERDA ASSESSMENT
2 Evidence Supporting Rankine Cycle Engine Technology
3 Understanding the Rankine cycle
4 How Does an Advanced Rankine Engine Work?
4.1 Audels Quadruple Expansion Engine Plan
4.2 Audels Quadruple Expansion Engine Plan Revised
4a United States Patent Cozby 4,395,885
4b Montana DNRC Project
4c Principles of Power Density
5 Superheat and Reheat and Pressure
6 Efficiency, Mileage, and Oil Considerations
7 Biomass for Engine Fuel
7a Biomass-Ellen Simpson Article
7b Letter to Department of Agriculture
7c Letter from Glacier Log Homes
7d Alaska Power Authority
8 Coal for Engine Fuel
8a Burlington Northern Railroad
8b Coal, China
9 "Green Car"
10 Cost to America
11 Department of Energy
11a Cozby, RBIC, and DOE
11b Catch-22
11c Noncompliance DOE, DOC
11c(1) Letter to Rep. Craig
11d DOE Duplicity
11e Addendum - DOE Duplicity
11f Letter From DOE
11g Axe DOE -- Sen. Bob Dole
11h IC Engine Reality Check
11i Advanced Rankine Engine Conundrum
12 General Motors
12a GM Letter
12b GM Letter page 2
12c GM Additional
12d(1) Gasoline Engine Problems
12d(2) Gas Engines Problems page 2
12d(3) Gas Engine Problems page 3
13 Uniflow Steam Engine
13a Uniflow vs. Multi-Cylinder Compound, a Response
14 References
14a Material Balance
14b Flow Diagram
14c How an Advanced Rankine Engine Works
14d Three Important Formulas
14e Audels Quadruple Expansion Engine Plan
14f Audels Quadruple Expansion Engine Revised
15. Jukka
16. Construction Zone
16 - I Flow Diagram - Material Balance
16-II Flow Diagram-Water and Steam Schematic Rev. 2
16-IIa Combustion Gas Path-Start Up
18-IIb Combustion Gas Path-Normal
16-IIc Combustion Gas Path-Break
16-III Anti-Freeze Schematic
16a. Drawing No. I REV. 4, 9.4.13
16b. Drawing No. 2
16c. Drawing No. 3, REV. 2, 7.1.13
16d Drawing No. 4, REV. 1, 7.1.13
16e Drawing No. 5
16f Drawing No. 6, REV. 1, 7.1.13
16g Drawing No. 7
16h Drawing Number 8
16i Drawing Number 9
16j Drawing Number 10
16k Drawing Number 11
16l Drawing Number 12
16m Drawing Number 13
16n Drawing Number 14
16-o Drawing Number 15
16p Drawing 16
16-q Drawing Number 17
16-r Drawing 18
16-s Drawing 19 CAM Drive/Yoke Pump Rev. 1
16-t Regenerative Pump Plan View Drawing 20
16-U Drawing Number 21
16-V Drawing Number 22
16-W Gen. lay-out Side Elevation Drawing 23
16-1 Jeep Engine 1
16-2 Jeep Engine 2
16-3 Jeep Engine 3
16-4 Jeep Engine 4
16-5 Jeep Engine 5
16-6 Advanced Steam Engine Mock-Up 1
16-7 Advanced Steam Engine Mock-Up 2
16-8 Advanced Steam Engine Mock-Up 3
16-9 Advanced Steam Engine Mock-Up 4
16-10 Advanced Steam Engine Conceptual Drawing
16-11 General Drawing Full Scale End View
16-12 Full Scale Gen. Drawing, with David for perspective
16-13 Cozby Brothers
16-14 Revised And Updated End Elevation View
16-15 Plan View
16-16 Mock-Up Completion
17 Steam Engines-Two Divergent Systems and Approaches
18 Wikipedia - Advanced steam technology May 3, 2014
19 Internal Memorandum for the Record
20 2015 Report
21 Dear Steam Engine Enthusiast
22 Mock-Up part 2
16-o Drawing Number 15
P. O. Box 1104
Anaconda
,
MT
59711
ph:
(406) 563-5186
alt:
(406) 560-0118
fbcanaco
nda
@msn
.com